At QTF Homes we strive to help clients who are building their dream homes, extending or renovating by providing a stress free experience. We have over 10 years residential and commercial building experience and have learnt a lot in this time. Every day our team are on-site fitting for clients and our purpose-built manufacturing factory is working on new projects simultaneously. The reason behind our success comes from our knowledge, experience, advice and customer service we offer each and every one of our clients (See what our clients have said here)

A typical milestone checklist timber frame home project will involve:

  • Plans past to timber frame manufacture for quotation
  • Approval of quotation from client layouts
  • Preparation of manufacturing drawings
  • Manufacture of the timber frame package
  • Project briefing meeting
  • Delivery
  • Erection
  • Handover
  • Final review meeting

Stages of service offered by QTF Homes, timber frame kit supplier: 

Stage 1: In order to quote for your project we will require a layout of your site plans (you can send these to raymond@qfhomes.co.uk). Our team will review  the plans and send you back a quote and consultation date to meet with you to discuss your self build future.

Stage 2: On approval of our quotation provided to you the client, we will be in touch to organise start and end dates so that you can continue to organise your self build.

Stage 3: Following the approval your plans are sent to our design team who will prepare accurate manufacturing drawings to manufacture your timber frame kit to the precise size.

Stage 4: Once your projects foundations are completed the timber frame kit is delivered, the panels can be assembled on site (QTF Homes timber frame kits can be deliver and assemble onsite throughout the UK and Ireland.

Stage 5: Following this the roof is constructed, sheathed and battened, and finally the windows and external doors fitted.

Stage 6: Once the shell is watertight the internal trades can start work, as the walls are dry-lined, there is no drying out time required for wet plaster prior to decorating.

A timber frame kit can take anything from three days to several weeks to erect, depending on the size, the site and weather conditions (The off-site construction and speedy erection means that bad weather on site is less of a problem). From the outside your timber-framed house the outer decorative ‘skin’ is finished in the same way as any traditional block house, using bricks, stone, timber cladding or rendered blockwork.

We recommend to ensure speed for your project that you find labour that is comfortable working with timber frame as it is harder than with brick and block, but most work can be done by us (delivery and installation) we can also recommend laborers we have worked with on previous projects to help. Always look for industry accreditation, such as TRADA or the UKTFA’s Q-mark.

Get in touch

Our team at QTF Homes work to tight schedules and will have you timber frame erected in good time for the rest of your build to commence. If you wish to receive a quote for your timber frame build please contact us on Tel: +44 28 4063 2494 or email info@qtfhomes.co.uk